Back Every Man a Tiger
Chapters (25)
  1. Title Page
  2. Dedication
  3. Introduction
  4. I - Into the Wild Blue
  5. Chapter 1 - Every Man a Tiger
  6. Chapter 2 - The Big Lie
  7. Chapter 3 - The Vision of Bill Creech
  8. II - Shield in the Sky
  9. Chapter 4 - Mission to Jeddah
  10. Chapter 5 - CENTCOM Forward
  11. Chapter 6 - Planning the Storm
  12. Chapter 7 - Band of Brothers and Sisters
  13. III - The Thousand-Hour War
  14. Chapter 8 - Storm!
  15. Chapter 9 - Hits and Misses
  16. Chapter 10 - Lost and Found
  17. Chapter 11 - Punch and Counterpunch
  18. Chapter 12 - A Day in the War
  19. Chapter 13 - The Ten Percent War
  20. Chapter 14 - Shock and Awe
  21. Chapter 15 - Building Coalitions
  22. Chapter 16 - Beyond Iraqi Freedom
  23. Acknowledgements
  24. BIBLIOGRAPHY
  25. INDEX

Through the eyes of the soldier on the ground, however, “CAS is airpower attacking the enemy that is killing me.” He sees it as powerful artillery. Sure, there must be measures to keep it from killing his own people, but the real issue is, “How do I get those jets to hit what is bothering me?”

These twin issues have been traditionally handled by means of the tactical air control party (TACP)—which is usually composed of a forward air controller (historically a fighter pilot in a helmet, with a rifle) and a radio operator who also drives the Air Force vehicle containing their radios and fixes broken equipment (radios, Humvees, or tents). The role of these two is to be assigned to a battalion (at the brigade and corps level, FACs are called ALOs, air liaison officers). The Army uses the FAC/ALO teams to communicate what it wants airpower to do, by means of preplanned processes. For example, the FAC/ALO may transmit a tasking directly to the TACC/AOC: “We need to hit the enemy machine gun bunker at 0300 two days from now in conjunction with an attack planned for 0330.” That tasking would go into the ATO as a “preplanned CAS sortie,” and forces would be assigned against that task.

Since the Army rarely knows what kind of air support they will need within the ATO cycle (two days), they put their requests for CAS in terms of “I will need ten CAS sorties sometime between 0300 and 0600 hours two days from now.” And this is translated into “air or ground alert CAS sorties.” Sometimes an aircraft that was intended to strike another target is diverted to support the ground forces because of a dire situation or an opportunity to do greater damage to the enemy. This is called “CAS Divert.” There will also be a CAS CAP, if the fighters must come from a great distance or if the need for the air is expected to be sudden and dire.

“Push CAS” is a planned concept wherein the sorties are spaced so as to fly over the friendly ground forces throughout the twenty-four-hour period. Meanwhile, there is in place a command-and-control lash-up that can access any of these sorties if it is reasonable to do so.

There are several ways for the aircraft to be sent into a particular area: the pilot may have been tasked to go there before takeoff, or he may have been sent there by Joint STARS, AWACS, or, in the past, a system called Air Borne Command Control Communications (ABCCC38).

Once the aircraft arrives in the area of the FAC, the FAC tells the flight leader what needs to be attacked, where the friendly ground forces are located (including himself), and special information, such as enemy defenses in the area and perhaps a required attack heading, in which he amplifies target location data: “Look 100 meters to the north of the bombed-out schoolhouse at the crossroads east of the small hill in the bend in the river.” This information is called a nine-line report, for it consists of nine items that must be briefed by the FAC (even if some elements are not required). 39