Contents ( 40)
- CONTENTS
- Acknowledgments
- DAY 1 Contact
- 1. The Country of Lost Borders
- 2. Vandenberg
- 3. Crisis
- 4. Alert
- DAY 2 Piedmont
- 5. The Early Hours
- 6. Piedmont
- 7. "An Unusual Process"
- 8. Directive 7-12
- 9. Flatrock
- 10. Stage I
- 11. Decontamination
- DAY 3 Wildfire
- 12. The Conference
- 13. Level V
- 14. Miscellaneous
- 15. Main Control
- 16. Autopsy
- 17. Recovery
- 18. The Noon Conference
- 19. Crash
- 20. Routine
- 21. The Midnight Conference
- DAY 4 Spread
- 22. The Analysis
- 23. Topeka
- 24. Evaluation
- 25. Willis
- 26. The Seal
- 27. Scared to Death
- 28. The Test
- 29. Three Minutes
- DAY 5 Resolution
- 30. The Last Day
- Epilogue
- References
9. Flatrock
MARK WILLIAM HALL, M.D., sat in the tight rear seat of the F-104 fighter and stared over the top of the rubber oxygen mask at the file on his knees. Leavitt had given it to him just before takeoff—a heavy, thick wad of paper bound in gray cardboard. Hall was supposed to read it during the flight, but the F-104 was not made for reading; there was barely enough room in front of him to hold his hands clenched together, let alone open a file and read.
Yet Hall was reading it.
On the cover of the file was stenciled WILDFIRE, and underneath, an ominous note:
THIS FILE IS CLASSIFIED TOP SECRET.
Examination by unauthorized persons
is a criminal offense punishable
by fines and imprisonment up to
20 years and $20,000.
When Leavitt gave him the file, Hall had read the note and whistled.
"Don't you believe it," Leavitt said.
"Just a scare?"
"Scare, hell," Leavitt said. "If the wrong man reads this file, he just disappears."
"Nice."
"Read it," Leavitt said, "and you'll see why."
The plane flight had taken an hour and forty minutes, cruising in eerie, perfect silence at 1.8 times the speed of sound. Hall had skimmed through most of the file; reading it, he had found, was impossible. Much of its bulk of 274 pages consisted of cross-references and interservice notations, none of which he could understand. The first page was as bad as any of them:
THIS IS PAGE 1 OF 274 PAGES
PROJECT: WILDFIRE
AUTHORITY: NASA/AMC
CLASSIFICATION: TOP SECRET (NTK BASIS)
PRIORITY: NATIONAL (DX)
SUBJECT: Initiation of high-security facility to prevent dispersion of toxic extraterrestrial agents.
CROSSFILE: Project CLEAN, Project ZERO CONTAMINANTS, Project CAUTERY
SUMMARY OF FILE CONTENTS:
By executive order, construction of a facility initiated January 1965. Planning stage March 1965. Consultants Fort Detrick and General Dynamics (EBD) July 1965. Recommendation for multistory facility in isolated location for investigation of possible or probable contaminatory agents. Specifications reviewed August 1965. Approval with revision same date. Final drafts drawn and filed AMC under WILDFIRE (copies Detrick, Hawkins). Choice of site northeast Montana, reviewed August 1965. Choice of site southwest Arizona, reviewed August 1965. Choice of site northwest Nevada, reviewed September 1965. Nevada site approved October 1965.
Construction completed July 1966. Funding NASA, AMC, DEFENSE (unaccountable reserves). Congressional appropriation for maintenance and personnel under same.
Major alterations: Millipore filters, see page 74. Self-destruct capacity (nuclear), page 88. Ultraviolet irradiators removed, see page 81. Single Man Hypothesis (Odd Man Hypothesis), page 255.
PERSONNEL SUMMARIES HAVE BEEN ELIMINATED FROM THIS FILE. PERSONNEL MAY BE FOUND IN AMC (WILDFIRE) FILES ONLY.
The second page listed the basic parameters of the system, as laid down by the original Wildfire planning group. This specified the most important concept of the installation, namely that it would consist of roughly similar, descending levels, all underground. Each would be more sterile than the one above.
THIS IS PAGE 2 OF 274 PAGES
PROJECT: WILDFIRE
PRIMARY PARAMETERS
1. THERE ARE TO BE FIVE STAGES: